Thursday, October 29, 2026

Prefabrication experiments - 532 - Advanced Panelization

Timber-based stressed skin panels have been explored since the beginning of the 20th century. In collaboration with the United States Department of Agriculture Forest Service, the Forest Products Laboratory first proposed buildings assembled from timber-framed panels to fast-track construction and reduce on-site waste associated with cutting, measuring, and adjusting to customized conditions. Light gauge steel and heavy concrete panelization have also demonstrated this flexible strategy linked to combining vertical or horizontal planes in variable configurations. This design agility augmented by streamlined fabrication and delivery, has supported the open framed panels becoming an integral part of contemporary building processes. These open panels cause little disruption to conventional building activities. Once designed by architects, projects are «panelized», optimally subdivided according to manufacturing limitations and criteria, without constraining the design phase. 

 

Fabricated on framing tables, automated or not, dimensionally coordinated panels can be flatpacked or bundled in sequence to easily orchestrate their assembly onsite. High-performance closed panels can include factory-installed weatherproofing, windows, doors, along with siding and interior finishes. This advanced form of panelization can lead to reduced sitework and highly efficient detail quality in climate-controlled environments.

 

Fabricating panels is an efficient offsite construction methodology with optimisations that require simple infrastructure when compared to the highly intensive production of modular volumetric units. Traditional modular factories build their volumes on linear production lines and fabricate all components as their onsite counterparts would with little innovation beyond protection from the elements. Further advancing panelization could inform changes in modular volumetric as the same panels could be assembled for floors, walls and roofs including interior and exterior finishes and then carried to a different section of the factory or to completely different manufacturers to be put together as boxes, delivered, hoisted and set into an overall modular composition.  Along with insulation, windows and weatherproofing, plumbing and interior mechanical systems, these planar elements could be conceived for serving two streams - one for sequenced, flatpacked delivery onsite and a second for assembly into complex volumes – optimising the system’s benefits for two complementary applications.


High performance panels by Ecocor




Monday, October 19, 2026

Prefabrication experiments - 531 - The Modern Long Building


At the end of the 19th century, industrialization, mass production, new materials and housing shortages converged to foster new building systems and types. Light timber housing in the form of balloon frames, steel skeletons covered in glass for tall buildings and intrinsically fireproofed reinforced concrete gave us the collective urban housing block. All three types, framed by construction methods, were also inflected by the broader reforms that were arising in society. New city patterns were shaped by these methods, suburbs sprouted with small houses in balloon and later in platform framing, and perhaps no urban environments were reshaped more than those spawned by the reinforced concrete block or slab building. These included some «mega» examples inspired by perceived assembly-line rationalizations applied to housing. Three examples, in Italy, Germany and France demonstrated the way these new buildings would be developed as autonomous urbanities.


Wartime propaganda led to Clemens Klotz's Colossus of Prora (1936-39) in Germany, (original design of 4,5 km in Rügen near Binz) planned as a leisure seaside retreat to keep the population loyal to the fascist regime through the concept of Strength Through Joy. France's Les Courtillières Serpentine building (1 060 m, in Pantin near Paris) designed by Émile Aillaud broke ground in the 1950s (1957-67) as part of the country's large-scale postwar building program and positioned flats in a curvilinear pattern that could conceivably go on endlessly. Not to be outdone, Italy's 1-km-long example in Rome (Corviale or Nuovo Corviale, 1975-82) designed by Mario Fiorentino was likely inspired by LeCorbusier's Slab buildings. All three express 20th-century modernism relating affordability with densely packed urban slabs, and quality of life with placing these buildings in large public gardens or scenic landscapes. Further their multifunctional infrastructures would generate economies and maximize social interactions between inhabitants.


While certainly an expression of optimized, serially designed dwelling systems, these megastructures came to connote a sameness and alienation. Located far from urban centres with inadequate services made most of these modern structures an argument against this type of dense urban living which and the underlying principles of modernism. Notwithstanding its negative aura, the long building remains one of the most iconic and optimistic representations of allying urbanism, construction systems, and assembly line principles in the pursuit of affordable housing.


left: Colossus (4,5 km); centre: Les Courtillères (1,06 km); right: Corviale (1 km)


Wednesday, October 7, 2026

Prefabrication experiments - 530 - PSSSHAK « Primary Supports Structure Housing Action Kits »


Separating common structural and infrastructure elements from interior non-permanent spatial systems has been posited by many as a way of providing a flexible framework for adaptable buildings that facilitate changes over time, responding to occupant evolution without destructive and wasteful demolition. The PSSHAK (Primary Supports Structure Housing Action) kit system presented to the UK government by a group assembled by John Habraken in the early 1970s deployed the author/architect's theories in a practical application for the design and construction of affordable housing. 

 

Structural walls supported a centralized organization with kitchens and baths defining interior zones within a rigorous row-house masterplan. The entire system was regulated by a 30cm grid to dimensionally coordinate the production of «kit» components. The grid also framed potential arrangements for users to organize their interiors while respecting overall design parameters, to at once engage occupants and implement coherence throughout the scheme. Linking design with fabrication and construction, the kit of parts strategy was developed to optimize logistics, material supply chains, construction methods, and procurement approaches as multiple projects would use these common elements and their mass production would generate economies of scale. 

 

Habraken underscored housing allocation’s complex process requiring efficiency and purchasing power for the collective while introducing freedom in planning personal systems for the individual or the household. Linking productive master planning and individualized microplanning remains a difficult challenge as the housing industry is dictated by a general-contractor or developer model that, in the name of profitability, will resist the progressive separation of supports and infill which limits their role to either common elements or to providing interior elements on a far more informal basis, cutting their margins. 

 

A system like PSSHAK requires a profound systemic transformation of the housing sector. It has been marginally supported with open building being implemented in theory but has proved to be challenging in practice. Habraken's theories behind the PSSHAK are today reframed by an era in which all housing stakeholders are looking to increase productivity and provide quality affordable housing.


Basic dwelling unit and its adaptable parameters